Work and work control of others

In this work I had a double assignment by a client to renovate the kitchen area and to control the work of others in a house of his own property but leased
In this house my job was to give color to the kitchen furniture and to mount the new handles, to rebuild the sink cabinet.
Install all hydraulic and exhaust systems.
Reposition the lights in the ceiling, insert the lights in the wall cabinets, apply Backsplash, change the switches.
Construction of two shelves in the kitchen
The passage of a TV cable from the second floor to the first floor.
Specific here is the first floor and the ground floor.
Upstairs dismantle and replace with new baseboard with painting.
Removing, replacing closed doors
The second task was to control the laying of wood and wooden floor, here are two brothers of Mexican origin, I must say good, orderly, good cooperation.
I then checked the laying of the new kitchen plan (marble) here worked a local company, nothing to say, know how to do their job.
Eventually the customer was pleased.

Cooking before work

During the works

At the end of the work, kitchen area, stairs and pavement on the second floor